RackForge / AI infrastructure supply

The backbone of
dense AI.

Racks, cooling and supporting hardware for serious GPU deployments. Source the physical infrastructure around DGX, HGX B200 and liquid-cooled clusters—not the compute itself.

Rack to row. Structure to thermal loop.

RackForge hero

Our sourcing principles

Specifications before selectionClear scope. No compute bundled.Configuration-aware purchasing

01 / Infrastructure systems

The node is only the beginning.

For data-center operators, integrators and AI platform teams building around demanding loads. Choose each layer against your node specifications and facility constraints.

01

Start with the structure.

Heavy-duty enclosures for ultra-dense GPU installations, plus seismic Zone 4 cabinet options. Evaluate mounting depth, load rating and facility anchoring before selecting a rack.

Heavy-duty racks / Seismic enclosures

Browse hardware
02

Move heat out of the rack.

Direct-to-chip CDUs and manifold kits for liquid loops. Active rear-door heat exchangers for rack-level heat rejection. Match flow, connections and facility water requirements to your deployment.

CDUs / Manifolds / Rear-door cooling

Browse hardware
03

Build the supporting systems.

Dual intelligent 3-phase PDU pairs at 415V / 60A+, 800G OSFP and InfiniBand AOC link bundles, and automated aisle-containment door kits. Power, connect and contain the row—not just the node.

Power / Optical links / Aisle containment

Browse hardware

02 / Budget your build

High-value hardware.
A clear starting range.

Indicative USD planning ranges, not live offers. Final price, availability, freight and compatibility depend on the specific product and configuration.

Heavy-duty racks / Seismic enclosures

$8,000–$10,500 / enclosure

CDUs / Manifolds / Rear-door cooling

$7,500–$12,000 / unit or door

Power / Optical links / Aisle containment

$7,000–$11,000 / pair, bundle or section

Many rack-scale purchases sit around $8,000–$10,000. Check individual listings for exact specifications and pricing.

03 / Build the foundation

Give your AI a place to perform.

Start with the rack. Plan the cooling, power and connections around it. Find the supporting hardware for your next deployment.

Explore the catalog